RACI Matrix Mapping
Teams map project tasks against roles using Responsible, Accountable, Consulted, and Informed designations. They analyze the grid horizontally and vertically to remove bottlenecks and eliminate gaps.
Choose this exercise
Purpose: Document and agree on who executes, approves, advises, and receives updates for each step in a workflow.
Use it when: Use when a team launches a cross-functional project or experiences duplicated effort, dropped tasks, or confusion over who makes final calls.
Skip it when: Skip when team workflows are completely emergent, exploratory, or handled by a single person with no handoffs.
Group arrangement: Small working groups of 4 to 6 people, or one single group of up to 8 around a shared grid.
Timing: UWT suggested practical duration. The original source document outlines an 8-step workshop process that requires 60 minutes for a single workflow.
Materials and tools
- Large whiteboard or wall space with painter's tape
- 4 pads of sticky notes in different colors (one color for activities, one for roles, two for RACI labels)
- Chisel-tip dry-erase markers or dark felt-tip pens (1 per person)
Before participants arrive
- Clear a 2-meter wide wall or whiteboard area.
- Draw a large empty two-axis grid: left vertical margin for tasks, top horizontal header for roles.
- Post the RACI reference definitions visibly next to the grid.
Say this to open
We are charting our workflow using a RACI matrix to make handoffs clear. Responsible means the person who does the work. Accountable means the single person who ensures it finishes correctly. Consulted means someone who provides input before the action. Informed means someone who gets notified after. We will list tasks down the side, roles along the top, and assign these letters together.
How to run it
Define scope and list tasks 10 minutes
Announce whether the session addresses the current reality or future design. Have participants write discrete process steps on yellow sticky notes, one task per note. Post them down the left side of the wall in chronological order. Limit to 6 to 10 key tasks for the session.
List roles 5 minutes
Ask participants to name the functional roles or job titles involved, not individual names. Write each role on a blue sticky note and line them across the top edge of the board above the grid.
Draft RACI assignments 20 minutes
Work row by row. For each task, invite participants to propose who is R, A, C, and I. Write the letters on separate sticky notes and place them in the grid cells. Enforce the rule: exactly one Accountable role per task. If multiple people share execution, pick one primary Responsible lead.
Horizontal and vertical audit 15 minutes
Read the chart across each row: confirm there is at least one R and exactly one A. Check for too many C or I labels that create drag. Read each role column vertically: check whether any role is overloaded with R marks or carries zero active responsibilities. Move sticky notes as the group renegotiates.
Confirm and debrief 10 minutes
Review the finalized grid as a room. Confirm that participants agree to follow the documented roles. Take two observations from the group on what changes immediately in their day-to-day coordination.
Debrief questions
- Which task had the most debate around who is Accountable, and why?
- Where did we find redundant notifications or excessive approvals that we can cut?
- What is the first handoff rule we need to apply starting tomorrow?
Finished output: A completed, balanced RACI grid displaying tasks on the vertical axis, roles on the horizontal axis, and agreed RACI letters in every relevant cell.
Remote
Set up a shared digital whiteboard with a pre-drawn table (tasks down rows, roles across columns). Provide digital sticky notes pre-labeled R, A, C, and I. Work through rows together, letting participants drag letters onto the grid while unmuting to discuss conflicts.
Hybrid
Appoint one in-person scribe to mirror physical sticky notes onto a shared digital board in real time. Remote participants type role and task ideas into the shared document chat or place digital notes directly, which the in-person facilitator reads aloud before physical placement.
Access and participation choices
- Participants can participate verbally, by writing notes, or by observing and signaling agreement via chat or thumbs-up.
- Anyone may choose to pass on debating a specific role without having to justify their choice.
If the session gets stuck
- Participants assign multiple Accountable people to a single task to avoid conflict.
- Remind the room that accountability cannot be shared. If two people are accountable, no one is accountable. Ask: if this task fails, which single seat must fix it?
- Everyone wants to be Consulted on every task, creating an unworkable grid.
- Challenge each C by asking: will this person block the launch if unconsulted? If they only need an update, change them to Informed.
Terms used here
- Responsible (R): The role that executes the task and does the actual labor.
- Accountable (A): The single role with final decision power and ownership of the result.
- Consulted (C): A two-way role asked for advice or technical input before work proceeds.
- Informed (I): A one-way role notified of progress or decisions after they happen.
Run this exercise live
The facilitator console stays in this browser. Its QR handoff is a short-lived participant snapshot containing only public exercise instructions, phase, prompt, and timer state.
What participants need now
Materials:
This is a participant-safe snapshot, not a response form. It sends nothing back to the facilitator.
Run this with your AI assistant +
Works with Claude, ChatGPT, Gemini, or your own local model: paste this prompt and your AI will co-facilitate this exercise with you.
Help me prepare and run the exercise below. First ask for my participant count, time, setting, access needs and intended result. Check these against the stated limits. Use the supplied rules and materials. Explain any proposed changes before using them, and label them as adaptations. Do not invent source claims or require personal disclosure. Give me one step at a time when I say start. I manage the people, physical activity and clock; do not claim to observe the room. Ask me what happened before choosing a next step. Reference revision: 74931e353b3b189ae3f57d003532534425d7f8bc047674ed29223d82c76a11e2 # RACI Matrix Mapping Teams map project tasks against roles using Responsible, Accountable, Consulted, and Informed designations. They analyze the grid horizontally and vertically to remove bottlenecks and eliminate gaps. **Time:** 60 minutes. UWT suggested practical duration. The original source document outlines an 8-step workshop process that requires 60 minutes for a single workflow. **People:** 4 to 24. Small working groups of 4 to 6 people, or one single group of up to 8 around a shared grid. ## Choose this exercise **Purpose:** Document and agree on who executes, approves, advises, and receives updates for each step in a workflow. **Use it when:** Use when a team launches a cross-functional project or experiences duplicated effort, dropped tasks, or confusion over who makes final calls. **Skip it when:** Skip when team workflows are completely emergent, exploratory, or handled by a single person with no handoffs. ## Materials and tools - Large whiteboard or wall space with painter's tape - 4 pads of sticky notes in different colors (one color for activities, one for roles, two for RACI labels) - Chisel-tip dry-erase markers or dark felt-tip pens (1 per person) ## Before participants arrive 1. Clear a 2-meter wide wall or whiteboard area. 2. Draw a large empty two-axis grid: left vertical margin for tasks, top horizontal header for roles. 3. Post the RACI reference definitions visibly next to the grid. ## Say this to open We are charting our workflow using a RACI matrix to make handoffs clear. Responsible means the person who does the work. Accountable means the single person who ensures it finishes correctly. Consulted means someone who provides input before the action. Informed means someone who gets notified after. We will list tasks down the side, roles along the top, and assign these letters together. ## How to run it ### 1. Define scope and list tasks (10 minutes) Announce whether the session addresses the current reality or future design. Have participants write discrete process steps on yellow sticky notes, one task per note. Post them down the left side of the wall in chronological order. Limit to 6 to 10 key tasks for the session. ### 2. List roles (5 minutes) Ask participants to name the functional roles or job titles involved, not individual names. Write each role on a blue sticky note and line them across the top edge of the board above the grid. ### 3. Draft RACI assignments (20 minutes) Work row by row. For each task, invite participants to propose who is R, A, C, and I. Write the letters on separate sticky notes and place them in the grid cells. Enforce the rule: exactly one Accountable role per task. If multiple people share execution, pick one primary Responsible lead. ### 4. Horizontal and vertical audit (15 minutes) Read the chart across each row: confirm there is at least one R and exactly one A. Check for too many C or I labels that create drag. Read each role column vertically: check whether any role is overloaded with R marks or carries zero active responsibilities. Move sticky notes as the group renegotiates. ### 5. Confirm and debrief (10 minutes) Review the finalized grid as a room. Confirm that participants agree to follow the documented roles. Take two observations from the group on what changes immediately in their day-to-day coordination. ## Debrief questions - Which task had the most debate around who is Accountable, and why? - Where did we find redundant notifications or excessive approvals that we can cut? - What is the first handoff rule we need to apply starting tomorrow? **Finished output:** A completed, balanced RACI grid displaying tasks on the vertical axis, roles on the horizontal axis, and agreed RACI letters in every relevant cell. ## Remote Set up a shared digital whiteboard with a pre-drawn table (tasks down rows, roles across columns). Provide digital sticky notes pre-labeled R, A, C, and I. Work through rows together, letting participants drag letters onto the grid while unmuting to discuss conflicts. ## Hybrid Appoint one in-person scribe to mirror physical sticky notes onto a shared digital board in real time. Remote participants type role and task ideas into the shared document chat or place digital notes directly, which the in-person facilitator reads aloud before physical placement. ## Access and participation choices - Participants can participate verbally, by writing notes, or by observing and signaling agreement via chat or thumbs-up. - Anyone may choose to pass on debating a specific role without having to justify their choice. ## If the session gets stuck **Participants assign multiple Accountable people to a single task to avoid conflict.** Remind the room that accountability cannot be shared. If two people are accountable, no one is accountable. Ask: if this task fails, which single seat must fix it? **Everyone wants to be Consulted on every task, creating an unworkable grid.** Challenge each C by asking: will this person block the launch if unconsulted? If they only need an update, change them to Informed. ## Terms used here - Responsible (R): The role that executes the task and does the actual labor. - Accountable (A): The single role with final decision power and ownership of the result. - Consulted (C): A two-way role asked for advice or technical input before work proceeds. - Informed (I): A one-way role notified of progress or decisions after they happen. ## Sources and adaptation Observed in WorkshopBank tool repository (updated December 2025). RACI matrix is a standard project management framework originating in twentieth-century management practice. Retained the 8-step sequence, horizontal/vertical analysis checks, and core RACI definitions from WorkshopBank evidence. Structured the timeline into a runnable 60-minute facilitation plan, added specific facilitator scripts, concrete troubleshooting rules, and hybrid coordination guidelines. [WorkshopBank](https://workshopbank.com/tools/raci-matrix) [WorkshopBank](https://workshopbank.com/raci-matrix) Current run sheet: https://unitedwetransform.com/exercises/raci-matrix-workshopbank/
Sources and adaptation
Observed in WorkshopBank tool repository (updated December 2025). RACI matrix is a standard project management framework originating in twentieth-century management practice.
Retained the 8-step sequence, horizontal/vertical analysis checks, and core RACI definitions from WorkshopBank evidence. Structured the timeline into a runnable 60-minute facilitation plan, added specific facilitator scripts, concrete troubleshooting rules, and hybrid coordination guidelines.