United We Transform | Facilitator run sheet

Stakeholder Mapping

Working groups place project actors on disposition and involvement axes, scale them by influence, map their relationships, and identify concrete actions to shift key skeptics toward active support.

35 minutes | 4 to 24 people

Choose this exercise

Purpose: Map working perceptions of key project contributors and affected groups to plan direct engagement actions for influential skeptics.

Use it when: Use during project kickoff or major transitions when a core project team needs to align on who affects project delivery and decide where to direct communication.

Skip it when: Skip when outside observers or the evaluated individuals are in the room, as recording personal perceptions about colleagues creates unnecessary friction.

Group arrangement: Working groups of 4 to 6 people. If numbers do not divide evenly, groups of 3 or 7 are permitted. Groups map distinct workstreams or map the same initiative from different perspectives.

Timing: 35 minutes suggested by UWT to cover silent listing, group positioning, relationship mapping, action drafting, and secure close.

Materials and tools

Before participants arrive

  1. Draw a large coordinate grid on each group's flip chart paper or digital canvas.
  2. Label the horizontal X axis 'Disposition' with 'Against' on the far left, 'Neutral' in the middle, and 'For' on the far right.
  3. Label the vertical Y axis 'Involvement' with 'None' at the bottom and 'High' at the top.
  4. Confirm the physical room or digital whiteboard is strictly private so uninvited staff cannot view draft assessments.

Say this to open

Welcome. Today we are mapping the people and groups who can make or break our project. We will track four groups: Sponsors, who initiate and own the change; Change Teams, who execute and design solutions; Reference Groups, who give feedback to ensure the work succeeds; and Users, who adopt the result. We will place them by their involvement, their stance toward the change, and their influence. Because this map captures subjective working perceptions, treat everything written as confidential. Do not photograph, copy, or leave sheets unattended.

How to run it

  1. Identify key groups 5 minutes

    Review the four categories: Sponsors, Change Teams, Reference Groups, and Users. Give participants three minutes to write key roles or teams individually on sticky notes. For example, write 'Procurement Review Board' or 'Site Supervisors'. Participants may choose to name functional units rather than named individuals.

  2. Position by disposition and involvement 10 minutes

    Working groups place their sticky notes on the grid together. Position each note horizontally along Disposition (left = Against, middle = Neutral, right = For) and vertically along Involvement (bottom = None, top = High). Use larger sticky notes or draw large circles around items with major influence over project outcomes. Small groups must reach basic consensus before placing each item.

  3. Map relationship ties 8 minutes

    Groups draw connecting lines between related roles on their chart. Draw solid lines to show positive, collaborative ties. Draw dashed lines to show strained or conflicting ties. Identify at least one supportive role that holds a solid connection to a skeptical or neutral role.

  4. Draft engagement actions 7 minutes

    Each table picks one or two influential roles currently located on the left or center of their board. The group writes one specific, observable action per role to help move them toward active support in the top right. For example: 'Schedule a 30-minute walkthrough with the Plant Manager to review the implementation schedule.'

  5. Targeted report and secure collection 5 minutes

    Ask a spokesperson from two tables to share one planned action and the relationship they plan to use. Select one debrief question to pose to the whole room. Then collect all physical charts into secure folders immediately or revoke edit access on digital boards.

Debrief questions

Finished output: A completed visual grid displaying key project groups by disposition, involvement, and relative influence, with at least one targeted action step to engage an influential skeptic.

Remote

Use a private online whiteboard with the two axes pre-drawn. Assign groups to private breakout rooms of 4 to 6 people. Pre-populate digital sticky notes in two sizes. Set board permissions to require named login and revoke link-sharing after the session.

Hybrid

Keep remote and in-person participants in separate groups rather than splitting a table. Remote groups work on the digital whiteboard; in-person groups work on physical chart paper. A nominated facilitator photographs the in-person sheets and uploads them to the restricted workspace after the session.

Access and participation choices

If the session gets stuck

Participants disagree strongly on whether a stakeholder is supportive or opposed.
Place the note on the Neutral line with a question mark. Turn the disagreement into an action item to speak with that person directly.
Groups generate too many minor actors, cluttering the chart.
Ask tables to focus only on actors who possess direct decision-making power or veto capacity over the project.

Terms used here

Sources and adaptation

Observed on WorkshopBank under the title 'Stakeholder Mapping'.

Preserved the source mechanic: two axes (Disposition from Against to For, Involvement from None to High), circle sizing for influence, connecting relationship lines, and identifying supporter-skeptic pathways. Added specific group sizing rules to accommodate odd counts, concrete category definitions in the opening script and steps, step-by-step timing summing to 35 minutes, and strict handling rules for sensitive materials.

See our editorial policy for AI use, sourcing and corrections.