United We Transform | Facilitator run sheet

Cups and Straws: UWT Prototype Version

Teams simulate procurement, fabrication, shipping, and customer testing of a tabletop bridge across three progressive rounds. Conditions shift from silent written specifications to open cross-role talk, direct customer co-design, and an unannounced requirement change.

60 minutes | 4 to 24 people

Choose this exercise

Purpose: Compare defect rates and cycle time across written handoffs, direct cross-functional talk, and embedded customer collaboration.

Use it when: Use during process improvement, agile adoption, or cross-functional workshops where teams experience siloed communication, handoff friction, or late customer feedback.

Skip it when: Skip when physical room movement is constrained, when tabletop assembly is inaccessible, or when teams cannot commit at least 60 continuous minutes.

Group arrangement: 1 to 4 production teams of 3 to 5 people (1 Procurement Specialist, 1 to 3 Fabricators, 1 Shipper/Receiver), plus 1 Customer Desk with exactly 1 Customer Inspector per production team. Handle odd group sizes by assigning extra participants as additional Fabricators at production tables or as an objective Process Observer. For example, 7 people form 1 production team of 5 (1 Procurement, 3 Fabricators, 1 Shipper), 1 Customer Inspector, and 1 Process Observer; 11 people form 2 production teams of 4, 2 Customers, and 1 Observer.

Timing: Source suggests 60 to 180 minutes. This standardized UWT run plan executes in 60 minutes.

Materials and tools

Before participants arrive

  1. Build the pre-workshop reference model: place two large cups upright on a flat surface exactly 20 cm apart edge-to-edge, tape two uncut straws horizontally across both rims in parallel, and balance one empty small cup on top of the straws.
  2. Set up distinct room stations: one central Procurement Station (holding raw cups, straws, tape), individual Fabrication Tables for production teams, a Shipping/Receiving boundary line, and a separate Customer Desk where the reference model remains visible only to Customer Inspectors during Round 1.
  3. Distribute starting production kits to each team table: 6 large cups, 4 small cups, 8 straws, 1 roll of masking tape, and 1 ruler.
  4. Place printed Role Cards and Customer Acceptance and Tally Sheets at respective tables, and keep the red silence card at the facilitator station.

Say this to open

Welcome. Today we simulate procurement, assembly, shipping, and quality assurance using cups, straws, and tape. We will run three distinct rounds. In Round 1, you must follow your printed role card instructions in absolute silence without speaking or gesturing. Procurement manages parts, Fabricators build to the written specification on their cards, Shippers transfer finished units, and Customers run acceptance tests. Pick up your role cards and read your duties now.

How to run it

  1. Assign roles and review specs 10 minutes

    Form production teams of 3 to 5 people and assign 1 Customer Inspector per team. Any leftover participant joins a table as an extra Fabricator or acts as a silent Process Observer. Distribute Role Cards. Clarify that the fabrication specifications are printed directly on the Fabricator Role Card. Fabricators may not view the Customer reference model during Round 1. Remind everyone that Round 1 requires absolute silence across the room.

  2. Run Round 1 in silence 10 minutes

    Start the 10-minute countdown. Enforce total silence. Procurement issues raw stock from the starting kit. Fabricators assemble units using only their card specifications. Shippers carry completed bridges one at a time to the Customer Desk. Customers time the 5-second balance test, mark results on the Tally Sheet, and reject or accept units without speaking or gesturing. At time, pause assembly, log accepted counts, and dismantle rejected units to return reusable cups and straws to procurement stock.

  3. Run Round 2 with open communication 12 minutes

    Announce Round 2: talking across all roles is now permitted. Shippers or Fabricators may visit the Customer Desk to inspect the physical reference model before resuming work. Teams coordinate freely to fabricate and deliver units. Customers test deliveries immediately on arrival, log results, and explain specific failure causes directly to Shippers. Stop at 12 minutes, record team accepted counts on the Tally Sheet, and replenish starting materials.

  4. Run Round 3 with customer partnership and pivot 13 minutes

    Send each Customer Inspector to sit directly at their assigned team's table to advise fabrication in real time. At minute 6, sound a chime and announce an immediate market change: every deliverable must now support two empty small cups balanced side-by-side or stacked on the bridge for 5 continuous seconds. Teams must immediately adapt work in progress and all remaining shipments. Stop at 13 minutes and compile final accepted output.

  5. Facilitate debrief and process takeaways 15 minutes

    Display final acceptance counts and rejection rates across rounds. Keep whole-room discussion focused by taking one observation per team. Ask Customer Inspectors what defects occurred most frequently during Round 1. Ask Fabricators how building from written text compared to collaborating directly with the customer. Ask Shippers how real-time feedback changed transport efficiency. Spend the final 4 minutes having participants identify one workplace handoff where written requirements create similar rework.

Debrief questions

Finished output: Completed cup-and-straw bridges tested against customer criteria, along with documented Customer Acceptance and Tally Sheets tracking throughput and defect rates across all three rounds. Participants may opt out of building and contribute process notes instead.

Remote

This simulation requires physical material assembly and separated room zones. It cannot run online without changing the defining mechanic. For virtual teams, run an online process mapping or user story slice session instead, or deliver this exercise during a co-located in-person gathering.

Hybrid

Station one dedicated laptop with an elevated webcam facing the Customer Desk. Remote participants act as Remote Customer Analysts alongside the in-person Customer Inspector. The in-person Customer tests deliveries in front of the camera, holds up the timer, and reads test outcomes aloud. Remote analysts log results directly into a shared live spreadsheet projected at the front of the room. Shippers check the shared spreadsheet screen for immediate acceptance status.

Access and participation choices

If the session gets stuck

Participants talk, laugh, or whisper during the silent first round.
Immediately raise the red silence card and stand near the offending table. If speech continues, pause that table's production clock for 15 seconds.
A team runs out of plastic cups or straws during fabrication.
Remind the Shipper and Fabricator that rejected units can be dismantled at the table and returned to Procurement to reuse intact cups and straws.

Terms used here

Role Cards

ROLE: PROCUREMENT SPECIALISTMission: Manage team supplies. You alone may collect raw materials from the Procurement Station. Hand materials to Fabricators as needed. Reclaim cups and straws from disassembled rejects.Round 1 Rule: Total silence. No speaking, gestures, or writing.Round 2 Rule: Open speech permitted.Round 3 Rule: Coordinate directly with Customer and Fabricators. ROLE: FABRICATORMission: Build the product at your table using only delivered supplies.Round 1 Spec: Stand two large cups upright, 20 cm apart edge-to-edge. Tape two uncut straws horizontally across the rims. The bridge must support 1 empty small cup for 5 continuous seconds without tipping or collapse.Round 1 Rule: Total silence. Rely strictly on written specifications. Do not look at the Customer reference model.Round 2 Rule: Open speech permitted. You may inspect the Customer reference model.Round 3 Rule: Build to live customer guidance and adapt immediately to requirement changes. ROLE: SHIPPER / RECEIVERMission: Transport finished prototypes from your table to the Customer Desk. Return rejected units to your table for rework.Round 1 Rule: Total silence. Deliver products one at a time.Round 2 Rule: Open speech permitted. Report verbal testing feedback back to your table.Round 3 Rule: Expedite rapid product iterations. ROLE: CUSTOMER INSPECTORMission: Inspect and test each delivered product. Time balance tests with a stopwatch. Record Pass or Fail on the Tally Sheet.Round 1 Test: 1 empty small cup balanced on the straws for 5 continuous seconds without tipping or collapse. Total silence. Give no hints.Round 2 Test: Same test, but explain failure causes clearly to the Shipper.Round 3 Test: Join your assigned production table. At the mid-round chime, announce that all accepted products must now support 2 small cups for 5 seconds. ROLE: PROCESS OBSERVER (Optional / Support Role)Mission: Stand neutrally near an assigned table. Record instances of confusion, handoff pauses, and communication shifts across Rounds 1, 2, and 3. Share 2 observations during the final debrief.

Customer Acceptance and Tally Sheet

TEAM NAME: _______________ ROUND: 1 / 2 / 3 ACCEPTANCE CRITERIA CHECKLIST:[ ] Two large cups upright on tabletop, rims facing up[ ] Exactly 20 cm distance between cup edges[ ] Exactly two uncut straws taped across the rims[ ] Balanced small cup(s) stay supported for 5 full seconds without hands touching DELIVERY LOG:Delivery # | Cups Supported (1 or 2) | 5-Second Hold (Pass/Fail) | Status (Accepted/Rejected)1 | | | 2 | | | 3 | | | 4 | | | 5 | | | 6 | | | 7 | | | 8 | | |  TOTAL DELIVERIES: _____ TOTAL ACCEPTED: _____ REJECTION RATE: _____%

Sources and adaptation

Observed in Relationship Makers Handbook (pages 122-123) and Collaboration.Ai (2009). The Collaboration.Ai record attributes module development to Sandy Worthing and Andy Heppelle; this run sheet records that as attribution within the source rather than verified origin.

Retained the three-round progression, procurement/fabrication/delivery/customer role taxonomy, silent round, and midpoint customer requirement shift from Collaboration.Ai and Relationship Makers Handbook notes. UWT standardizations include explicit group sizing rules for odd numbers, embedding the technical specification directly into the Fabricator Role Card, adding a Process Observer role for flexible participation, clarifying role-specific debrief questions, and defining camera and spreadsheet mechanics for hybrid Customer Analysts.

See our editorial policy for AI use, sourcing and corrections.