United We Transform | Facilitator run sheet

Building the Tower

Three teams race to recreate a hidden model tower, only to discover that each team lacks critical materials that the other teams hold in surplus.

25 minutes | 6 to 24 people

Choose this exercise

Purpose: Demonstrate how artificial competition and siloed resource allocation affect collaboration across teams with shared goals.

Use it when: Use when cross-functional departments work toward identical organizational targets but hoard information or physical supplies.

Skip it when: Skip when the team has existing interpersonal conflict where simulated hoarding or deception could entrench real resentment.

Group arrangement: Exactly 3 competing subgroups, with 2 to 8 participants per group.

Timing: Source specifies 15 minutes of introduction and building plus 10 minutes of debrief, totaling 25 minutes.

Materials and tools

Before participants arrive

  1. Substantial advance prep required: Construct the reference tower using exactly 15 cups, 25 sticks, 5 sheets of paper, and tape. Keep it hidden behind a screen or in an adjoining room.
  2. Assemble Packets 1, 2, and 3 into separate bags or boxes.
  3. Set up three building tables separated across the room to discourage casual sightlines.

Say this to open

Your goal is to build a tower that matches the hidden model tower. Each group will select one representative. Only that representative will be allowed to view the model. A prize goes to the team whose tower most closely replicates the original. Representatives, come with me to view the model. Once you return to your tables, facilitators will not answer any questions.

How to run it

  1. Form teams and conduct initial viewing 3 minutes

    Divide participants into exactly three equal teams. Assign each team to a table and distribute one resource packet per team. Call one representative from each team to view the hidden model for exactly 30 seconds. Representatives must leave all phones, pens, and paper behind. They may inspect the model visually but not touch it. Answer rules questions before they return. Announce that once representatives return, facilitators will give no further advice or hints.

  2. Begin phase one construction 5 minutes

    Start a 5-minute countdown. Representatives return to their teams and explain the design while members begin building with their packet contents. Facilitators observe silently and do not answer questions. If teams ask about other teams' materials or suggest trading, offer neutral responses like 'Your instructions are to match the model.' Neither encourage nor forbid trading.

  3. Hold midpoint summit and second viewing 2 minutes

    Pause the clock at 5 minutes. Call all three representatives to the center of the room. Ask each representative to state aloud: one thing their team is doing well, and one challenge they face. Immediately escort them back to the hidden model for a second 30-second inspection. Then send them back to their tables.

  4. Complete final construction 5 minutes

    Restart the countdown for the final 5 minutes of building. Observe whether teams begin negotiating, sharing surplus supplies, or maintaining strict secrecy. Stop all construction immediately when the timer hits zero.

  5. Showcase models and debrief results 10 minutes

    Bring the hidden reference model to the center of the room. Have one representative from each group present their finished tower. Compare each tower to the model and point out the combined inventory: across all three packets, there were 45 cups, 75 sticks, and 15 sheets of paper, exactly enough to build three identical towers. Conduct the debrief with the whole room, taking 4 to 6 total contributions.

Debrief questions

Finished output: Three physical towers compared directly against the target reference model, along with identified resource distribution patterns.

Remote

This activity requires hands-on physical building and identical physical kits; it cannot run fairly in a fully remote format without redesigning the core mechanic. For remote teams, run a virtual negotiation activity such as a shared digital diagram allocation game instead.

Hybrid

Hybrid delivery is not recommended because remote members cannot manipulate the physical crafting materials alongside co-located members. If hybrid is unavoidable, remote participants must serve strictly as design directors and note-takers paired with an on-site builder via live video feed.

Access and participation choices

If the session gets stuck

A team discovers that another team has extra tape and attempts to steal it.
Remind teams that physical taking without consent is not permitted; trades require agreement between the groups.
Teams realize early on that pooling resources wins and merge into one big team.
Allow it without comment. Document when the realization occurred and use it as a focal point during the debrief.

Terms used here

Sources and adaptation

Observed in Teampedia entry 'Building the Tower'. Original author not documented in source records.

Retained the exact resource allocations, packet contents, and two-stage representative viewing structure from the Teampedia source. Added explicit step timing that sums to 25 minutes, structured the midpoint summit, and provided precise facilitator boundaries regarding neutral responses.

See our editorial policy for AI use, sourcing and corrections.